Here is a list of what was/going to be accomplished. Pictures/Vlog to follow! * = Work completed
1) New drywall ceiling (3/8" over old 1/2") *
2) Finish all walls and paint (We only did a really sloppy tape coat 19 years ago) *
3) Ceiling access door (insulated) Had a piece of drywall sitting in the opening. *
4) Insulated garage door (Old one took a beating from my safari rack

5) Jack lift garage door opener with internet control. Replacing Craftsman screw drive. <--This still works but I didnt want one on the ceiling again.
6) Complete airline runs. 50ft retractable mounted on ceiling.
7) Retractable 12 gauge power cord on ceiling.

9) Paint doors/Add trim.
10) LED Lights with automatic on/off *
11) Split AC/Heat to condition the space.
12) Possible flooring (epoxy, tiles or something else)
13) Welding cart added *
My garage door just showed up today, we have been without a functioning door for almost a month! Hope to get this installed either today or Saturday (When help is around!! LOL)